Monday, April 15, 2013

Concrete blocks finished!

Monday- they didn't start until 12ish and wrapped up around 6:30pm.

First impression: it's not as tall inside as I thought it would be, upon measuring its like 92-93 inches from the footer to the top of the concrete. Also not too happy with some of the joints, as seen in the pic below.

They did install a French drain which is a flexible black pipe back to a cistern, which is seen in the back corner in the pic.